Grease Trap Requirements
Cary, NC

FOG compliance regulations for food service establishments in Cary, North Carolina.

FOG Compliance in Cary, NC

Food service establishments in Cary operate under a combination of federal EPA pretreatment standards, North Carolina state plumbing code, and city-level FOG ordinances. Together these rules determine how grease traps must be sized, how often they must be pumped, and what happens when a restaurant falls out of compliance.

Pumping frequency is the compliance rule restaurant owners interact with most often. In Cary, the rule is: Every 60 days. This is tighter than the 90-day US median. The city follows the International Plumbing Code (IPC) for trap sizing and installation. Under Section 1003.3.4, which sizes traps by drainage fixture unit counts, grease interceptors installed in Cary must meet minimum capacity thresholds based on the fixtures connected to them — 3-compartment sinks, dishwashers, pre-rinse stations, wok stoves, and floor drains on the cook line. The local minimum trap size is: Per IPC sizing requirements; interceptor installation plan must be approved.

Cary requires a dedicated FOG permit for any food service establishment generating fats, oils, and grease. The permit is separate from, and in addition to, the plumbing permit required at installation.

Cary enforces the 25 percent rule: grease traps must be pumped before the combined FOG and settled solids reach 25 percent of the trap's total liquid depth. Inspectors measure the depth with a sludge judge or dipstick, typically at surprise visits. Exceeding the threshold at inspection triggers a notice of violation and mandatory emergency pump-out, regardless of the scheduled pumping cycle. Installation inspection with plumbing inspection; re-inspection fee $50. Establishments must maintain pumping logs, hauler manifests, and inspection reports on-site — missing records is itself a violation in most enforcement actions. Enforcement authority rests with the Town of Cary Water Resources Department, Pretreatment Division, which handles permit issuance, inspections, and hauler licensing.

For a deeper explanation of the rules this city enforces, read our guides on how grease traps work and the 25/50 pumping rule.

Every 60 days
Pumping Freq.
Required
Permit
Yes
25% Rule
IPC
Code Base

Pumping Requirements

Frequency Every 60 days; FSEs may apply for Service Variance if less frequent cleaning is adequate
25% Rule Applies

Permits & Enforcement

Permit Required Required

Complete FOG Regulations

Minimum Trap Size Per IPC sizing requirements; interceptor installation plan must be approved
Pumping Frequency Every 60 days; FSEs may apply for Service Variance if less frequent cleaning is adequate
25% Rule Yes — trap must be pumped when grease and solids reach 25% of capacity
Permit Required Yes
Inspections Installation inspection with plumbing inspection; re-inspection fee $50
Record Keeping Required — maintain pumping logs and manifests on-site
Plumbing Code International Plumbing Code (IPC)
Authority Town of Cary Water Resources Department, Pretreatment Division

Additional Notes

Grease interceptor installation plan required before construction. Sizing and design must meet town requirements.

Last verified: — Regulations change frequently. Always verify current requirements with your local wastewater authority or plumbing inspector before making compliance decisions.

Contact Information

Phone (919) 319-4564, (919) 462-2072

Town of Cary Utilities Department Pretreatment Division: (919) 319-4564 or (919) 462-2072

Official Sources

Size Your Grease Trap for Cary

Our free calculator uses IPC code requirements to recommend the right size.

Open Calculator

Other Cities in North Carolina

Charlotte

At minimum every 90 days; must be pumped before FO...

Concord

Every 90 days or when 25% full...

Durham

weekly...

Fayetteville

Every 60 days maximum for grease traps; daily or p...

Greensboro

Quarterly (every 90 days minimum) or when 25% full...

Harrisburg

quarterly...

Kannapolis

Annual...

Raleigh

Minimum every 90 days (quarterly). Must be pumped ...