Grease Trap Requirements
Wheeling, WV

FOG compliance regulations for food service establishments in Wheeling, West Virginia.

FOG Compliance in Wheeling, WV

Food service establishments in Wheeling operate under a combination of federal EPA pretreatment standards, West Virginia state plumbing code, and city-level FOG ordinances. Together these rules determine how grease traps must be sized, how often they must be pumped, and what happens when a restaurant falls out of compliance.

Pumping frequency is the compliance rule restaurant owners interact with most often. In Wheeling, the rule is: quarterly. This aligns with the 90-day US median enforced by most major cities. The city follows the International Plumbing Code (IPC) for trap sizing and installation. Under Section 1003.3.4, which sizes traps by drainage fixture unit counts, grease interceptors installed in Wheeling must meet minimum capacity thresholds based on the fixtures connected to them — 3-compartment sinks, dishwashers, pre-rinse stations, wok stoves, and floor drains on the cook line.

Wheeling enforces the 25 percent rule: grease traps must be pumped before the combined FOG and settled solids reach 25 percent of the trap's total liquid depth. Inspectors measure the depth with a sludge judge or dipstick, typically at surprise visits. Exceeding the threshold at inspection triggers a notice of violation and mandatory emergency pump-out, regardless of the scheduled pumping cycle.

For a deeper explanation of the rules this city enforces, read our guides on how grease traps work and the 25/50 pumping rule.

quarterly
Pumping Freq.
Check locally
Permit
Yes
25% Rule
IPC
Code Base

Pumping Requirements

Frequency quarterly; or when grease/solids reach 25% of capacity
25% Rule Applies

Permits & Enforcement

Permit Required Contact authority

Complete FOG Regulations

Pumping Frequency quarterly; or when grease/solids reach 25% of capacity
25% Rule Yes — trap must be pumped when grease and solids reach 25% of capacity
Permit Required Contact authority
Record Keeping Check local requirements
Plumbing Code International Plumbing Code (IPC)
Ordinance Ref. Ordinance

Additional Notes

Best Management Practices (BMP) program referenced

Last verified: — Regulations change frequently. Always verify current requirements with your local wastewater authority or plumbing inspector before making compliance decisions.

Contact Information

Phone (304) 234-3874
Email orwpcdpt@wheelingwv.gov

(304) 234-3874 orwpcdpt@wheelingwv.gov

Official Sources

Size Your Grease Trap for Wheeling

Our free calculator uses IPC code requirements to recommend the right size.

Open Calculator

Other Cities in West Virginia

Charleston Morgantown

Regular servicing required; manifests checked duri...