FOG Compliance in Lowell, MA

Food service establishments in Lowell operate under a combination of federal EPA pretreatment standards, Massachusetts state plumbing code, and city-level FOG ordinances. Together these rules determine how grease traps must be sized, how often they must be pumped, and what happens when a restaurant falls out of compliance.

Pumping frequency is the compliance rule restaurant owners interact with most often. In Lowell, the rule is: As determined by Executive Director. This aligns with the 90-day US median enforced by most major cities. The city follows the International Plumbing Code (IPC) for trap sizing and installation. Under Section 1003.3.4, which sizes traps by drainage fixture unit counts, grease interceptors installed in Lowell must meet minimum capacity thresholds based on the fixtures connected to them — 3-compartment sinks, dishwashers, pre-rinse stations, wok stoves, and floor drains on the cook line.

Lowell requires a dedicated FOG permit for any food service establishment generating fats, oils, and grease. The permit is separate from, and in addition to, the plumbing permit required at installation. Violations carry maximum penalties of 300 . Fines typically escalate with repeat violations, and severe discharges that cause sanitary sewer overflows can trigger federal Clean Water Act penalties layered on top of local fines.

Lowell enforces the 25 percent rule: grease traps must be pumped before the combined FOG and settled solids reach 25 percent of the trap's total liquid depth. Inspectors measure the depth with a sludge judge or dipstick, typically at surprise visits. Exceeding the threshold at inspection triggers a notice of violation and mandatory emergency pump-out, regardless of the scheduled pumping cycle. As determined by Lowell Regional Wastewater Utility. Establishments must maintain pumping logs, hauler manifests, and inspection reports on-site — missing records is itself a violation in most enforcement actions. Enforcement authority rests with the Lowell Regional Wastewater Utility, which handles permit issuance, inspections, and hauler licensing.

For a deeper explanation of the rules this city enforces, read our guides on how grease traps work and the 25/50 pumping rule.

As determined by Executive Dir
Pumping Freq.
Required
Permit
Yes
25% Rule
IPC
Code Base

Pumping Requirements

Frequency As determined by Executive Director; must not allow FOG to exceed capacity
25% Rule Applies

Permits & Enforcement

Permit Required Required
Max Fine 300

Complete FOG Regulations

Pumping Frequency As determined by Executive Director; must not allow FOG to exceed capacity
25% Rule Yes — trap must be pumped when grease and solids reach 25% of capacity
Permit Required Yes
Maximum Fine 300
Inspections As determined by Lowell Regional Wastewater Utility
Record Keeping Required — maintain pumping logs and manifests on-site
Plumbing Code International Plumbing Code (IPC)
Ordinance Ref. City of Lowell Code Chapter 272 - Water and Sewers
Authority Lowell Regional Wastewater Utility

Additional Notes

Interceptors required when deemed necessary by Executive Director for handling liquid wastes with excessive grease. Fine is $300 per day of violation. MA state plumbing code 248 CMR 10.09 governs sizing based on GPM flow rates. Interceptors must be readily accessible for cleaning.

Last verified: — Regulations change frequently. Always verify current requirements with your local wastewater authority or plumbing inspector before making compliance decisions.

Contact Information

Phone (978) 674-1622

(978) 674-1622

Official Sources

Size Your Grease Trap for Lowell

Our free calculator uses IPC code requirements to recommend the right size.

Open Calculator

Other Cities in Massachusetts

Billerica

Monthly (internal grease traps); Every 90 days (ex...

Boston

Quarterly minimum (every 90 days); must be pumped ...

New Bedford

Monthly or when FOG/sludge reaches 25% of effectiv...

Tewksbury

At least every 3 months or when 25% rule is trigge...

Worcester

Quarterly per 248 CMR 10.00 (Massachusetts Uniform...

Springfield

Internal traps: monthly; External traps: every 90 ...