Grease Trap Requirements
Lakewood, CO

FOG compliance regulations for food service establishments in Lakewood, Colorado.

FOG Compliance in Lakewood, CO

Food service establishments in Lakewood operate under a combination of federal EPA pretreatment standards, Colorado state plumbing code, and city-level FOG ordinances. Together these rules determine how grease traps must be sized, how often they must be pumped, and what happens when a restaurant falls out of compliance.

Pumping frequency is the compliance rule restaurant owners interact with most often. In Lakewood, the rule is: annual. This is more lenient than the US median, typical of jurisdictions with lower-volume food service sectors. The city follows the International Plumbing Code (IPC) for trap sizing and installation. Under Section 1003.3.4, which sizes traps by drainage fixture unit counts, grease interceptors installed in Lakewood must meet minimum capacity thresholds based on the fixtures connected to them — 3-compartment sinks, dishwashers, pre-rinse stations, wok stoves, and floor drains on the cook line.

Lakewood enforces the 25 percent rule: grease traps must be pumped before the combined FOG and settled solids reach 25 percent of the trap's total liquid depth. Inspectors measure the depth with a sludge judge or dipstick, typically at surprise visits. Exceeding the threshold at inspection triggers a notice of violation and mandatory emergency pump-out, regardless of the scheduled pumping cycle.

For a deeper explanation of the rules this city enforces, read our guides on how grease traps work and the 25/50 pumping rule.

annual
Pumping Freq.
Check locally
Permit
Yes
25% Rule
IPC
Code Base

Pumping Requirements

Frequency annual; or when grease/solids reach 25% of capacity
25% Rule Applies

Permits & Enforcement

Permit Required Contact authority

Complete FOG Regulations

Pumping Frequency annual; or when grease/solids reach 25% of capacity
25% Rule Yes — trap must be pumped when grease and solids reach 25% of capacity
Permit Required Contact authority
Record Keeping Check local requirements
Plumbing Code International Plumbing Code (IPC)
Ordinance Ref. art 3; art 1; art 4; CHAPTER 1; art 2

Last verified: — Regulations change frequently. Always verify current requirements with your local wastewater authority or plumbing inspector before making compliance decisions.

Contact Information

Phone (303) 987-7500

Public Works Department: (303) 987-7500

Official Sources

Size Your Grease Trap for Lakewood

Our free calculator uses IPC code requirements to recommend the right size.

Open Calculator

Other Cities in Colorado

Brighton

Every 90 days for interceptors; every 7 days for g...

Colorado Springs

monthly; or when grease/solids reach 25% of capaci...

Denver

At minimum every 90 days; must pump when FOG and s...

Estes Park Grand Junction

Every 90 days (quarterly); or when grease/solids r...

Aurora

Quarterly (every 90 days) or more frequently as ne...

Fort Collins

As needed; must pump before FOG/solids exceed 33% ...