| Requirement | New York, NY | Phoenix, AZ |
|---|---|---|
| Plumbing Code | IPC (NYC Plumbing Code based on International Plumbing Code with local amendments) | UPC (Arizona adopts UPC statewide) |
| Min. Trap Size | Determined by fixture count and flow rate per NYC Plumbing Code Section 1003.3; gravity interceptors sized per ASME A112.14.3 (typically 750-2000 gallons for FSEs); under-sink traps (hydromechanical) rated at minimum 20 GPM for smaller operations | Gravity grease interceptors minimum 750 gallons for food service establishments; sizing per Phoenix City Code and Arizona Plumbing Code based on fixture count and flow rate; point-of-use interceptors minimum 20 GPM |
| Pumping Frequency | As needed to prevent discharge exceeding 100 mg/L FOG; NYC DEP recommends at minimum every 90 days; must be pumped before grease and solids accumulation exceeds 25% of wetted depth | Every 90 days minimum; more frequently if grease accumulation exceeds 25% of capacity |
| 25% Rule | Yes | Yes |
| Permit Required | Required | Required |
| Permit Fee | No separate FOG permit fee; covered under sewer connection/discharge permits. DEP may require a Wastewater Discharge Permit for significant facilities | Industrial pretreatment/FOG permit required; registration fees typically $50-$150 annually |
| Max Fine | $25,000 per day per violation under NYC Administrative Code Title 24; additional civil penalties possible | $2,500 per violation per day under Phoenix City Code; administrative penalties may also apply |
| Inspections | DEP conducts inspections as needed, typically annually for FSEs with compliance issues; self-monitoring required | City of Phoenix Environmental Services Division inspects FSEs; frequency varies, typically annually for permitted facilities |
| Record Keeping | Yes | Yes |
| Authority | NYC Department of Environmental Protection (DEP) | City of Phoenix Water Services Department, Environmental Services Division |
| Establishments | 24,639 | 8,992 |
Key Differences
As cities in different states, New York (NY) and Phoenix (AZ) operate under distinct regulatory frameworks. Here are the most important differences restaurant operators should know:
- New York follows the Uniform Plumbing Code (UPC), while Phoenix uses the Uniform Plumbing Code (UPC). This affects trap sizing calculations and installation standards.
- Pumping schedules differ: New York requires "As needed to prevent discharge exceeding 100 mg/L FOG", whereas Phoenix requires "Every 90 days minimum".
- Both cities enforce the 25% rule, requiring grease traps to be pumped when grease and solids reach 25% of the trap's capacity.
- Fines differ: New York penalties can reach $25,000 per day per violation under NYC Administrative Code Title 24; additional civil penalties possible, compared to $2,500 per violation per day under Phoenix City Code; administrative penalties may also apply in Phoenix.
What This Means for Restaurant Operators
If you operate food service establishments in either city, understanding these regulatory differences is critical for compliance. Permit requirements vary, so check with each city's wastewater authority before opening a new location. Different plumbing codes (IPC (NYC Plumbing Code based on International Plumbing Code with local amendments) vs UPC (Arizona adopts UPC statewide)) mean trap sizing calculations may produce different results for the same kitchen setup. Always verify current requirements directly with your local wastewater authority or plumbing inspector.
Frequently Asked Questions
How do grease trap requirements compare between New York and Phoenix?
New York follows the Uniform Plumbing Code (UPC), while Phoenix uses the Uniform Plumbing Code (UPC). This affects trap sizing calculations and installation standards. Pumping schedules differ: New York requires "As needed to prevent discharge exceeding 100 mg/L FOG", whereas Phoenix requires "Every 90 days minimum".
Which city has stricter grease trap enforcement, New York or Phoenix?
Enforcement varies: both cities have similar permit requirements. New York fines: $25,000 per day per violation under NYC Administrative Code Title 24; additional civil penalties possible. Phoenix fines: $2,500 per violation per day under Phoenix City Code; administrative penalties may also apply. Always verify with local authorities.
How do pumping schedules differ between New York and Phoenix?
New York: As needed to prevent discharge exceeding 100 mg/L FOG; NYC DEP recommends at minimum every 90 days; must be pumped befor. Phoenix: Every 90 days minimum; more frequently if grease accumulation exceeds 25% of capacity.
Regulations change frequently. Always verify current requirements with your local wastewater authority or plumbing inspector before making compliance decisions. Last updated: March 2026.
Operating in Both Cities?
Use our sizing calculator to find the right grease trap for each location.
Open Calculator