New York vs Arlington

Side-by-side FOG compliance comparison betweenNew York, NY and Arlington, TX.

RequirementNew York, NYArlington, TX
Plumbing CodeIPC (NYC Plumbing Code based on International Plumbing Code with local amendments)IPC
Min. Trap SizeDetermined by fixture count and flow rate per NYC Plumbing Code Section 1003.3; gravity interceptors sized per ASME A112.14.3 (typically 750-2000 gallons for FSEs); under-sink traps (hydromechanical) rated at minimum 20 GPM for smaller operationsBased on total potential flow from all food prep/handling/serving fixtures per city sizing spreadsheet
Pumping FrequencyAs needed to prevent discharge exceeding 100 mg/L FOG; NYC DEP recommends at minimum every 90 days; must be pumped before grease and solids accumulation exceeds 25% of wetted depthPer TCEQ model standards; minimum every 90 days or per 25% rule
25% RuleYesYes
Permit RequiredRequiredRequired
Permit FeeNo separate FOG permit fee; covered under sewer connection/discharge permits. DEP may require a Wastewater Discharge Permit for significant facilitiesContact Water Resource Services at 817-459-5902
Max Fine$25,000 per day per violation under NYC Administrative Code Title 24; additional civil penalties possibleUp to $2,000 per violation per day under Texas Local Government Code
InspectionsDEP conducts inspections as needed, typically annually for FSEs with compliance issues; self-monitoring requiredPeriodic inspections by Water Resource Services
Record KeepingYesYes
AuthorityNYC Department of Environmental Protection (DEP)City of Arlington Water Resource Services
Establishments24,6394,506

Key Differences

As cities in different states, New York (NY) and Arlington (TX) operate under distinct regulatory frameworks. Here are the most important differences restaurant operators should know:

What This Means for Restaurant Operators

If you operate food service establishments in either city, understanding these regulatory differences is critical for compliance. Permit requirements vary, so check with each city's wastewater authority before opening a new location. Different plumbing codes (IPC (NYC Plumbing Code based on International Plumbing Code with local amendments) vs IPC) mean trap sizing calculations may produce different results for the same kitchen setup. Always verify current requirements directly with your local wastewater authority or plumbing inspector.

Frequently Asked Questions

How do grease trap requirements compare between New York and Arlington?

New York follows the Uniform Plumbing Code (UPC), while Arlington uses the International Plumbing Code (IPC). This affects trap sizing calculations and installation standards. Pumping schedules differ: New York requires "As needed to prevent discharge exceeding 100 mg/L FOG", whereas Arlington requires "Per TCEQ model standards".

Which city has stricter grease trap enforcement, New York or Arlington?

Enforcement varies: both cities have similar permit requirements. New York fines: $25,000 per day per violation under NYC Administrative Code Title 24; additional civil penalties possible. Arlington fines: Up to $2,000 per violation per day under Texas Local Government Code. Always verify with local authorities.

How do pumping schedules differ between New York and Arlington?

New York: As needed to prevent discharge exceeding 100 mg/L FOG; NYC DEP recommends at minimum every 90 days; must be pumped befor. Arlington: Per TCEQ model standards; minimum every 90 days or per 25% rule.

Full New York DetailsFull Arlington Details

Last verified: — Regulations change frequently. Always verify current requirements with your local wastewater authority or plumbing inspector before making compliance decisions.

Operating in Both Cities?

Use our sizing calculator to find the right grease trap for each location.

Open Calculator