Miami vs Fort Worth

Side-by-side FOG compliance comparison betweenMiami, FL and Fort Worth, TX.

RequirementMiami, FLFort Worth, TX
Plumbing CodeIPC (Florida Building Code, which is based on the International codes)IPC (Texas adopted IPC with local amendments)
Min. Trap SizeGravity grease interceptors: minimum 750-1,000 gallons depending on establishment size and fixture count. Hydromechanical grease interceptors (HGIs/under-sink): rated per GPM of connected fixtures per Florida Building Code. Sizing determined per FOG Control Device Guidance Manual formulas.1,000 gallons minimum for exterior grease interceptors; hydromechanical grease interceptors (HGIs) must be minimum 50 GPM rated per UPC/manufacturer specs
Pumping FrequencyAs specified in FOG permit conditions; typically every 30-90 days depending on establishment volume. Must be pumped before grease and solids accumulate to 25% of the wetted depth of the interceptor.At minimum every 90 days; must be pumped when FOG and solids accumulate to 25% of wetted depth
25% RuleYesYes
Permit RequiredRequiredRequired
Permit FeeInitial FOG-1 permit application fee approximately $200; annual renewal fee approximately $65. Fees subject to update per Miami-Dade fee schedule.Included with Industrial Waste Discharge permit; no separate FOG fee typically published
Max FineUp to $15,000 per day per violation under Miami-Dade County Code. Civil penalties and administrative enforcement actions including cease-and-desist orders.$2,000 per violation per day (Class C misdemeanor under city code); up to $10,000/day for industrial pretreatment violations
InspectionsInspections conducted by Miami-Dade Water and Sewer Department (WASD) on a routine basis; typically annually for compliant FSEs, more frequently for high-risk or non-compliant establishments. Unannounced inspections authorized.At least annually; high-risk facilities may be inspected quarterly
Record KeepingYesYes
AuthorityMiami-Dade County Water and Sewer Department (WASD), Environmental Compliance Section; Miami-Dade Permitting and Inspection CenterFort Worth Water Department, Environmental Division / Pretreatment Section
Establishments6,0894,506

Key Differences

As cities in different states, Miami (FL) and Fort Worth (TX) operate under distinct regulatory frameworks. Here are the most important differences restaurant operators should know:

What This Means for Restaurant Operators

If you operate food service establishments in either city, understanding these regulatory differences is critical for compliance. Permit requirements vary, so check with each city's wastewater authority before opening a new location. Different plumbing codes (IPC (Florida Building Code, which is based on the International codes) vs IPC (Texas adopted IPC with local amendments)) mean trap sizing calculations may produce different results for the same kitchen setup. Always verify current requirements directly with your local wastewater authority or plumbing inspector.

Frequently Asked Questions

How do grease trap requirements compare between Miami and Fort Worth?

Miami follows the Uniform Plumbing Code (UPC), while Fort Worth uses the Uniform Plumbing Code (UPC). This affects trap sizing calculations and installation standards. Pumping schedules differ: Miami requires "As specified in FOG permit conditions", whereas Fort Worth requires "At minimum every 90 days".

Which city has stricter grease trap enforcement, Miami or Fort Worth?

Enforcement varies: both cities have similar permit requirements. Miami fines: Up to $15,000 per day per violation under Miami-Dade County Code. Civil penalties and administrative enforcement actions including cease-and-desist orders.. Fort Worth fines: $2,000 per violation per day (Class C misdemeanor under city code); up to $10,000/day for industrial pretreatment violations. Always verify with local authorities.

How do pumping schedules differ between Miami and Fort Worth?

Miami: As specified in FOG permit conditions; typically every 30-90 days depending on establishment volume. Must be pumped befo. Fort Worth: At minimum every 90 days; must be pumped when FOG and solids accumulate to 25% of wetted depth.

Full Miami DetailsFull Fort Worth Details

Last verified: — Regulations change frequently. Always verify current requirements with your local wastewater authority or plumbing inspector before making compliance decisions.

Operating in Both Cities?

Use our sizing calculator to find the right grease trap for each location.

Open Calculator