Grease Trap Requirements
Laredo, TX

FOG compliance regulations for food service establishments in Laredo, Texas.

Minimum every 90 days per TCEQ
Pumping Freq.
Required
Permit
Yes
25% Rule
IPC
Code Base

Pumping Requirements

Frequency Minimum every 90 days per TCEQ model standards
25% Rule Applies

Permits & Enforcement

Permit Required Required
Permit Fee Per city fee schedule (contact Laredo Utilities)
Max Fine Up to $2,000 per violation per day (TX municipal ordinance standard)

Complete FOG Regulations

Minimum Trap Size Per TCEQ model standards and IPC sizing; determined by fixture count and flow
Pumping Frequency Minimum every 90 days per TCEQ model standards
25% Rule Yes — trap must be pumped when grease and solids reach 25% of capacity
Permit Required Yes
Permit Fee Per city fee schedule (contact Laredo Utilities)
Maximum Fine Up to $2,000 per violation per day (TX municipal ordinance standard)
Inspections Periodic inspections by Water Pollution Control Division
Record Keeping Required — maintain pumping logs and manifests on-site
Plumbing Code International Plumbing Code (IPC)
Ordinance Ref. City of Laredo Code of Ordinances (Municode); TCEQ HB 1979 model standards
Authority City of Laredo Utilities / Water Pollution Control Division

Additional Notes

Laredo Utilities operates a 'Cease the Grease' education program. Texas TCEQ model grease ordinance standards (HB 1979, August 2004) apply as baseline. Grease traps not required for residential users.

Regulations change frequently. Always verify current requirements with your local wastewater authority or plumbing inspector before making compliance decisions. Last updated: March 2026.

Size Your Grease Trap for Laredo

Our free calculator uses IPC code requirements to recommend the right size.

Open Calculator

Other Cities in Texas

Allen Amarillo

Every 90 days...

Austin

Every 90 days minimum; more frequently if grease a...

Corpus Christi

Every 60 days standard; increased to every 30 days...

Dallas

Every 90 days minimum; more frequently if grease a...

El Paso

Minimum every 90 days; more frequently if 25% rule...

Fort Worth

At minimum every 90 days; must be pumped when FOG ...

Frisco

annual...