Miami vs Arlington
Side-by-side FOG compliance comparison between Miami, FL and Arlington, TX.
| Requirement | Miami, FL | Arlington, TX |
|---|---|---|
| Plumbing Code | IPC (Florida Building Code, which is based on the International codes) | IPC |
| Min. Trap Size | Gravity grease interceptors: minimum 750-1,000 gallons depending on establishment size and fixture count. Hydromechanical grease interceptors (HGIs/under-sink): rated per GPM of connected fixtures per Florida Building Code. Sizing determined per FOG Control Device Guidance Manual formulas. | Based on total potential flow from all food prep/handling/serving fixtures per city sizing spreadsheet |
| Pumping Frequency | As specified in FOG permit conditions; typically every 30-90 days depending on establishment volume. Must be pumped before grease and solids accumulate to 25% of the wetted depth of the interceptor. | Per TCEQ model standards; minimum every 90 days or per 25% rule |
| 25% Rule | Yes | Yes |
| Permit Required | Required | Required |
| Permit Fee | Initial FOG-1 permit application fee approximately $200; annual renewal fee approximately $65. Fees subject to update per Miami-Dade fee schedule. | Contact Water Resource Services at 817-459-5902 |
| Max Fine | Up to $15,000 per day per violation under Miami-Dade County Code. Civil penalties and administrative enforcement actions including cease-and-desist orders. | Up to $2,000 per violation per day under Texas Local Government Code |
| Inspections | Inspections conducted by Miami-Dade Water and Sewer Department (WASD) on a routine basis; typically annually for compliant FSEs, more frequently for high-risk or non-compliant establishments. Unannounced inspections authorized. | Periodic inspections by Water Resource Services |
| Record Keeping | Yes | Yes |
| Authority | Miami-Dade County Water and Sewer Department (WASD), Environmental Compliance Section; Miami-Dade Permitting and Inspection Center | City of Arlington Water Resource Services |
| Establishments | 6,089 | 4,506 |
Key Differences
As cities in different states, Miami (FL) and Arlington (TX) operate under distinct regulatory frameworks. Here are the most important differences restaurant operators should know:
- Miami follows the Uniform Plumbing Code (UPC), while Arlington uses the International Plumbing Code (IPC). This affects trap sizing calculations and installation standards.
- Pumping schedules differ: Miami requires "As specified in FOG permit conditions", whereas Arlington requires "Per TCEQ model standards".
- Both cities enforce the 25% rule, requiring grease traps to be pumped when grease and solids reach 25% of the trap's capacity.
- Fines differ: Miami penalties can reach Up to $15,000 per day per violation under Miami-Dade County Code. Civil penalties and administrative enforcement actions including cease-and-desist orders., compared to Up to $2,000 per violation per day under Texas Local Government Code in Arlington.
What This Means for Restaurant Operators
If you operate food service establishments in either city, understanding these regulatory differences is critical for compliance. Permit requirements vary, so check with each city's wastewater authority before opening a new location. Different plumbing codes (IPC (Florida Building Code, which is based on the International codes) vs IPC) mean trap sizing calculations may produce different results for the same kitchen setup. Always verify current requirements directly with your local wastewater authority or plumbing inspector.
Frequently Asked Questions
How do grease trap requirements compare between Miami and Arlington?
Miami follows the Uniform Plumbing Code (UPC), while Arlington uses the International Plumbing Code (IPC). This affects trap sizing calculations and installation standards. Pumping schedules differ: Miami requires "As specified in FOG permit conditions", whereas Arlington requires "Per TCEQ model standards".
Which city has stricter grease trap enforcement, Miami or Arlington?
Enforcement varies: both cities have similar permit requirements. Miami fines: Up to $15,000 per day per violation under Miami-Dade County Code. Civil penalties and administrative enforcement actions including cease-and-desist orders.. Arlington fines: Up to $2,000 per violation per day under Texas Local Government Code. Always verify with local authorities.
How do pumping schedules differ between Miami and Arlington?
Miami: As specified in FOG permit conditions; typically every 30-90 days depending on establishment volume. Must be pumped befo. Arlington: Per TCEQ model standards; minimum every 90 days or per 25% rule.
Regulations change frequently. Always verify current requirements with your local wastewater authority or plumbing inspector before making compliance decisions. Last updated: March 2026.
Operating in Both Cities?
Use our sizing calculator to find the right grease trap for each location.
Open Calculator