Fort Worth vs Arlington

Side-by-side FOG compliance comparison between Fort Worth, TX and Arlington, TX.

Requirement Fort Worth, TX Arlington, TX
Plumbing Code IPC (Texas adopted IPC with local amendments) IPC
Min. Trap Size 1,000 gallons minimum for exterior grease interceptors; hydromechanical grease interceptors (HGIs) must be minimum 50 GPM rated per UPC/manufacturer specs Based on total potential flow from all food prep/handling/serving fixtures per city sizing spreadsheet
Pumping Frequency At minimum every 90 days; must be pumped when FOG and solids accumulate to 25% of wetted depth Per TCEQ model standards; minimum every 90 days or per 25% rule
25% Rule Yes Yes
Permit Required Required Required
Permit Fee Included with Industrial Waste Discharge permit; no separate FOG fee typically published Contact Water Resource Services at 817-459-5902
Max Fine $2,000 per violation per day (Class C misdemeanor under city code); up to $10,000/day for industrial pretreatment violations Up to $2,000 per violation per day under Texas Local Government Code
Inspections At least annually; high-risk facilities may be inspected quarterly Periodic inspections by Water Resource Services
Record Keeping Yes Yes
Authority Fort Worth Water Department, Environmental Division / Pretreatment Section City of Arlington Water Resource Services
Establishments 4,506 4,506

Key Differences

Even though both cities are in Texas, their FOG compliance requirements can differ significantly at the municipal level. Here are the most important differences restaurant operators should know:

What This Means for Restaurant Operators

If you operate food service establishments in both cities, understanding these regulatory differences is critical for compliance. Permit requirements vary, so check with each city's wastewater authority before opening a new location. Different plumbing codes (IPC (Texas adopted IPC with local amendments) vs IPC) mean trap sizing calculations may produce different results for the same kitchen setup. Always verify current requirements directly with your local wastewater authority or plumbing inspector.

Frequently Asked Questions

How do grease trap requirements compare between Fort Worth and Arlington?

Fort Worth follows the Uniform Plumbing Code (UPC), while Arlington uses the International Plumbing Code (IPC). This affects trap sizing calculations and installation standards. Pumping schedules differ: Fort Worth requires "At minimum every 90 days", whereas Arlington requires "Per TCEQ model standards".

Which city has stricter grease trap enforcement, Fort Worth or Arlington?

Enforcement varies: both cities have similar permit requirements. Fort Worth fines: $2,000 per violation per day (Class C misdemeanor under city code); up to $10,000/day for industrial pretreatment violations. Arlington fines: Up to $2,000 per violation per day under Texas Local Government Code. Always verify with local authorities.

How do pumping schedules differ between Fort Worth and Arlington?

Fort Worth: At minimum every 90 days; must be pumped when FOG and solids accumulate to 25% of wetted depth. Arlington: Per TCEQ model standards; minimum every 90 days or per 25% rule.

Regulations change frequently. Always verify current requirements with your local wastewater authority or plumbing inspector before making compliance decisions. Last updated: March 2026.